Skip to content
Stern Didactic GmbH
  1. 01 / 09

    7 PARTS.EACH ONE MADE.

    Classic metal-trades training project: seven parts in steel and aluminium are turned, milled, drilled, reamed and threaded, with real ISO fits (Ø20H8/e8 sliding fit, Ø8H7 for the ISO 7379 shoulder screw), roughness down to Ra 0.8 and a DIN 76-A thread undercut.

    Wind turbine in exploded view.
  2. 03 / 09

    TURBINE TOWER.TURNED.

    The tower is the longest part of the project and its machining centrepiece: an aluminium truncated cone, 220 mm long, Ø50 mm at the bottom and Ø30 mm at the top.

    Turned part · Aluminium · Guide time 3 h

    What this part involves

    1. Calculate the taper data and define the method
    2. Clamp the blank and face the first end
    3. Drill the Ø5 mm tapping hole to a depth of 20 mm
    4. Cut the M6 thread to a depth of 15 mm
    Wind turbine: Turbine tower.
  3. 05 / 09

    HUB.TURNED.

    The hub is the rotor hub of the wind turbine and carries the didactically most important fit of the project: its central Ø20H8 bore with Ra 0.8 runs on the Ø20e8 shank of the shaft and thereby forms a pure clearance fit.

    Turned part · Aluminium · Guide time 3.5 h

    What this part involves

    1. Calculate the fit before the first chip
    2. Clamp the blank, face and pre-drill
    3. Bore to Ø19.8 mm and finish the outside diameter
    4. Re-clamp and produce the width
    Wind turbine: Hub.
  4. 07 / 09

    WING SEAT.MILLED.

    At about 13 g the wing seat is the smallest and lightest part of the turbine and is needed three times: it connects one wing each to the hub.

    Milled part · Aluminium · Guide time 1.5 h

    What this part involves

    1. Clamp the blank strip and mill the datum face
    2. Mill the 20 mm width and check squareness
    3. Mark out or program the hole positions from the reference edge
    4. Centre and drill the four Ø4.5 mm holes
    Wind turbine: Wing seat.
  5. 09 / 09

    ASSEMBLED.INSPECTED.

    Produce turned and milled parts to drawing, applying general and ISO tolerances confidently. Produce and measure fits (H8/e8, H7) and judge their function.

    Assembly · Guide time 1 h

    What this part involves

    1. Pre-assembling the rotor
    2. Screwing the axle into the head
    3. Fitting the rotor
    4. Tower onto the base

    Request a quoteProject details

    Wind turbine, fully assembled.

Model: Autodesk Fusion, Stern Didactic. Taken over without simplification; what is hidden in Fusion is missing here too.